A permanent baseload heat source, with zero capital risk
Data centres run 24/7. Their waste heat is one of the most reliable, lowest-carbon heat sources available at scale. We deliver it under a long-term Heat Purchase Agreement, you carry no investment risk.
The IHP proposition for district heating operators
At least 10% lower heat production costs
Data centre waste heat at COP 3.5–6 consistently undercuts biomass, gas and conventional heat pump alternatives on levelised cost. The electricity cost per MWh is one quarter to one third of the electricity price, the primary driver of the economics.
Zero capital investment from you
The project company owns the entire heat recovery asset: heat exchangers, heat pumps, pipework and monitoring infrastructure. You sign an HPA and receive heat. The investment risk sits with the project, not with you.
One third of the carbon footprint vs. gas
Data centre waste heat carries minimal additional carbon, directly supporting your decarbonisation targets. Verified carbon accounting is provided for your reporting obligations.
Long-term price stability
HPA pricing is indexed to an agreed formula, insulating your network from gas and biomass price volatility. A predictable cost structure for long-term planning.
Exceptional supply stability
Data centres operate at consistent loads year-round. Unlike industrial waste heat, servers don't take holidays or seasonal shutdowns. Contracts specify a heat delivery band with guaranteed minimum volumes and uptime obligations backed by buffer storage.
Temperatures, volumes and network integration
Delivery temperatures
Modern industrial heat pumps in data centre applications reliably deliver 70–90°C. Fourth generation district heating networks (4GDH) at 55–70°C supply are particularly well suited and allow a higher COP. Higher temperature requirements are achievable but affect efficiency.
Heat volumes & stability
A data centre with 10 MW IT load can supply 5–8 MWth. Data centres operate at consistent loads year-round, and buffer storage provides reserves during planned maintenance windows.
COP & economics
COP of 3.5–6 depending on season and network return temperature. At COP 5, the electricity cost per MWh of heat is one fifth of the electricity price, significantly cheaper than gas or biomass alternatives on a levelised basis.