The project that became our model

Scandinavian Data Centers were planning a new data centre and came to us for advice on district heating. Their sustainability ambitions ruled out venting the heat from their facility, so we helped them build a contracted route for it into the city of Eskilstuna's heat network. The method we worked out along the way is the one Calentix has followed ever since.

Client
Scandinavian Data Centers (SDC)
Location
Eskilstuna, Sweden
Facility
Rock cavern data centre
Calentix role
Technical and commercial development
Stage reached
Heat Access Agreement
10 MW

heat recoverable at full build-out

15+ years

length of the heat agreement

2026

first phase of the facility on site

How it started

SDC contacted us with a plan for a highly efficient data centre in a former rock cavern and a vision that included reusing the waste heat. They needed someone who knew district heating from the inside: how a network buys heat, what it is willing to pay, which temperatures and availability it requires, and what a utility needs to see before it commits.

Ducts and equipment in an industrial heat recovery plant.

What we developed

We produced the early technical and commercial design: how the heat would be taken off the facility, what it would be worth to the network, how the parties would share responsibility, and whether the case was strong enough to justify going further. It was.

We stayed on as SMEs during the rest of the process, when the agreement was developed.

With the agreement the recovered heat went from a stated intention to a contracted resource, which is the point where a project can carry an investment decision. It remains the milestone we develop towards in every project.

The heat is contracted directly between SDC and the heat utility on a long term agreement, with up to 10 MW assessed as recoverable as the facility builds out. The data centre is under construction, and heat deliveries start once it is in operation and the server load has reached the level the network needs.

Why it matters to us

Eskilstuna was our first project and the reason Calentix exists. The work showed that a third party is very beneficial to involve when taking a waste heat project from idea to signed agreement.

It also gave us the staged model we apply to every site we assess. Each of the eight stages in our development model was first tested here.